Most residential installs take one to two days on the roof. Here’s what to expect when our crew arrives.
Morning: safety and racking
The crew sets up fall protection, confirms the layout against the approved plans and installs flashed roof attachments. Every penetration is sealed and covered by our 25-year workmanship warranty.
Afternoon: panels and wiring
Rails go on, panels are mounted and wired, and the electrician connects the system to your main panel through a dedicated breaker and rapid-shutdown device.
After install: inspection and PTO
Your city inspects the work, then your utility grants permission to operate (PTO). We handle both and activate monitoring so you can watch production from day one.